America’s Dream Streetcar System: Seattle

In 2007, Seattle opened a 1.3 mile modern streetcar line on the north side of the city.  It did fine and ridership improved.  Now, big changes are coming in 2016 and beyond.  Firstly, the Seattle Department of Transportation (SDOT) will open its second streetcar line.  The First Hill Line will be 2.5 miles and because of the existing trolleybus wires it will be primarily battery powered.  This is only the second line in the US to have battery powered streetcars.  The line will be a major transit link between an university and downtown Seattle so I expect heavy ridership.  Also in 2016, the first line will get dedicated lanes.  This will make the line run much faster and service will be much better.  SDOT hopes to connect the two lines in 2018 with a line that runs in dedicated lanes.  When that happens, Seattle will have the most futuristic streetcar system in the US.  I hope that Seattle’s combo of dedicated lanes and battery powered streetcars makes it the envy of every American streetcar city!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s